Key Benefits
- Easier alloying
- Better metal quality
- Proven technology
- Low investment
Key Features
- Holding furnace with up to 15 tons capacity
- Preheating ramp for alloying elements
- Customizable burner control
- Flexible furnace fill with launder system or liquid metal filling pocket
Applications
- Re-alloying
- Re-finishing of alloys
- Processing of special alloys
- Re-melting scrap
The perfect mix and the perfect temperature
The addition of a specially designed pre-heating ramp (dry hearth) - equipped with one or two gas burners and positioned immediately behind the furnace door - allows alloying elements or additional master alloys to be slowly warmed or quickly melted as required, before reaching a 7-15 t capacity aluminium melt bath.

Technical Details and Options
- Bath content: 7 tons to 15 tons
- Tiltable or static versions
- Holding chamber porous plug option
- Liquid metal filling pocket




